Recent Changes - Search:

BE-BI-PM Section


SEM GRIDS brainstorming


SEM grids list

LocationInstall.DateEnergyNumberMechanismBeam SizesN WiresMaterialPitch
Source        
Em.Meter20090.0451H+1V     
SpectroJul 20100.0451H     
LEBT        
After SOL1 0.0451H+1V  24  
TEST BENCH        
RFQ,MEBT (Em.Meter) 31H+1V     
RFQ,MEBT (Spectro) 31H     
DTL1 (Em.Meter) 121H+1V     
DTL1 (Spectro) 121H     
Intertanks        
After DTL3 501H + 1V     
After CCDTL3 791H + 1V     
After CCDTL7 1001H + 1V     
After PIM5 1291H + 1V     
After PIM12 1601H + 1V     

DRAFT WS AND SEM GRID CURRENT AND TEMP TABLES

Wire signals

Wire temperature for 400us, 40mA, ASSUMING EVERYWHERE A 1mm X 2mm BEAM SPOT
The simulation has been done for a central wire, i.e. where the particles density is maximum and for 10 linac pulses.


MEETINGS

18-Feb-2010
03-Mar-2010
24-Mar-2010
07-Apr-2010
28-Apr-2010
17-Jun-2010
01-Jul-2010



Related Documents and Links



Edit - History - Print - Recent Changes - Search
Page last modified on July 01, 2010, at 05:22 PM EST